Update
The latest on the house is that the exterior demolition is mostly finished. On the inside the plaster is still on the exterior walls and the old bathroom walls still need to be taken down. Dumpster number four has been delivered. The tuckpointer has set up scaffolding on the back of the house and he will be starting shortly. Tomorrow I am meeting the contractor at the house to discuss the near final plans from the architect. I also think that the tuckpointer and the electrician may be there to discuss their parts of the project.
Things are moving along although I can’t really gauge if things are on schedule for an October finish. Probably not but I can hope…
Things are moving along although I can’t really gauge if things are on schedule for an October finish. Probably not but I can hope…
0 Comments:
Post a Comment
<< Home