Electrical!
The electrician has also started installation. This is on the second floor where most of the outlet boxes are installed. The HVAC people were also there so I assume their stuff will be finished this week (except for the placement of the AC compressors which will have to wait until the new concrete gets poured).
0 Comments:
Post a Comment
<< Home