Update
I haven’t provided an over-all status report in awhile so here goes:
-met with the cabinet maker last Friday. He is going to start on the bathroom vanities and the bed for the master bedroom. We also discussed the basic lay-out for the kitchen and a few other odds & ends. I will post some photos of the bathroom sinks that I am getting. All of the vanities will be dark wood with plate glass tops.
-the HVAC is almost all installed.
-the plumber and electrician are supposed to be done this week with the majority of their work.
-we have a bid for the custom windows and doors for the back of the house. I think those have been ordered and the only thing holding that up is the brick repair which is proceeding at a snails pace.
-once the electrician and plumber finish the insulation will be put in and the sheet-rock will go up. Of course, this is dependant on the windows and doors on the back being installed (see above).
-the contractor’s team is planning to build the deck and the privacy fence while another crew puts up the sheet rock. Hopefully the timing for that works out.
-I checked out the Duravit Happy D tub that my friend Aaron had. I decided to get it even though it is more than I should be spending on a tub. I am still getting it cheaper than either it or anything else like it would be (if I had to pay retail).
-met with the cabinet maker last Friday. He is going to start on the bathroom vanities and the bed for the master bedroom. We also discussed the basic lay-out for the kitchen and a few other odds & ends. I will post some photos of the bathroom sinks that I am getting. All of the vanities will be dark wood with plate glass tops.
-the HVAC is almost all installed.
-the plumber and electrician are supposed to be done this week with the majority of their work.
-we have a bid for the custom windows and doors for the back of the house. I think those have been ordered and the only thing holding that up is the brick repair which is proceeding at a snails pace.
-once the electrician and plumber finish the insulation will be put in and the sheet-rock will go up. Of course, this is dependant on the windows and doors on the back being installed (see above).
-the contractor’s team is planning to build the deck and the privacy fence while another crew puts up the sheet rock. Hopefully the timing for that works out.
-I checked out the Duravit Happy D tub that my friend Aaron had. I decided to get it even though it is more than I should be spending on a tub. I am still getting it cheaper than either it or anything else like it would be (if I had to pay retail).