Concrete












New concrete was poured today. From top to bottom, it is:

-garage (the existing concrete had a hig point in the center so there would have been gaps on either end when it was closed)

-basement (closing the holes dug for the new plumbing)

-pad at the bottom of the stairs off the deck

-capping the stairs to the basement and covering a hole where plumbing was installed