Thursday, November 30, 2006

Window trim





The windows and doors are getting trim. The top photo is the west guest bedroom, then the dining room, and the living room (old trim is going back up). The trim isn't going to be uniform throughout the house but I guess if it bugs me once it is all done I can replace it later.

Stair treads

The pile of lumber doesn't look all that impressive but it is the new stair treads which are going to be red oak. The things are damn expensive. They will be installed after the second floor hard woods are re-finished.

Hard wood floors



These are photos of sample spots the hard wood renovation guys sanded so I could decide if I wanted to re-stain the floors. The top photo is the first floor where the floors are red oak. The lower photo is the second floor where the floors are white oak. I decided to go without any new stain - the floors will be a bit darker once the poly is applied.

Tuesday, November 28, 2006

Fireplace & exposed brick


As part of the painting and finish work on the interior, they clean the exposed brick up to get it ready to be sealed. Looks pretty good in a vintage sort of way. The mantle still needs some work. However, the tile is perhaps the best original part of the house.
Updating other things:
-the walls are all primed and the ceilings and closets are painted. The rest of the walls will be painted after the hardwoods are re-finished.
-the sewer guy "started" although that just means he took a trip to city hall to get the permit. I guess it is his problem if he gets to spend some time with freezing rain dripping off him because he didn't get the job done before the weather turns into winter on Thursday.

Floor renovation has started


Monday, November 27, 2006

Wall colors


I scanned in the paint samples for all of the interior walls. The scann didn't come out completely accurate as the top two do not have that much red/pink in them and the one red isn't that red. It gives you a basic idea of the color scheme, however.

Walls with primer






The interior walls and ceilings got primed today. Ceilings and closets will be painted tomorrow morning and then the floor sub is supposed to start renovating the floors.

Garage - part 2


This was taken tonight. Three of the four sides are now more or less finished. The alley side will be done after the last large dumpster is removed.

Sunday, November 26, 2006

Garage




The garage was sided over the weekend. I don't have a photo of the finished product but the front and side is finished. The alley side/back won't be finished until the last dumpster is removed.

Kitchen cabinets



While I was celebrating turkey day I was able to stop by the cabinet makers to see how things are coming. The cabinet my nephew is standing in is the fridge cabinet - it is rather large.

Monday, November 20, 2006

Latest info

Here is the latest information:
-Today the crew installed the last big window on the back (the one in the “hallway” between the master bath and master bedroom) and caulked the other windows.
-The HVAC crew was at the house tonight. I think they were hooking up the furnace (I didn’t talk to them – I just dropped in to see if a paint sample had been left).
-The sewer lateral will be installed Monday & Tuesday of next week. After it is installed the plumbing will be finished being hooked up (it is more or less hooked up now). The fixtures will still have to be installed after the floors are re-finished.
-Since the weather is good this week the new man-door and windows will be installed in the garage (the side facing the house). Siding may also go up this week.
-The hardwood floor renovation will start next Monday also. It is supposed to be finished that week (that is allowing extra time since we don’t think they can finish in four days). All the floors will be wood and will be restored using “rescued wood” from other houses. I need to figure out what stain I want to use.

Photos from Sunday





I took these photos on Sunday when the sun was shining.

Brick - Tower Grove House




The painted brick of the Tower Grove House is the inspiration for how I want to paint the brick on the back of the house.

Saturday, November 18, 2006

Garage roof


The garage has a new roof. The real difference will be when the new siding goes up. You can also see that the dumpster had to be swapped out. I think the next one will be a smaller version. I am planning on loading up a lot of the wood scraps to take to my brother's for a bonfire...

Second floor




Photos of the three bedrooms on the second floor.

First floor






These photos were taken last night (dark outside) and this afternoon. The mudding of the dry wall is not completely done yet but it looks pretty good. The wooden windows in the living room will be re-finished as will the mantle. The brick that is exposed will get cleaned - right now there is still some plaster, etc obscuring the brick. The cord that is dangling in the kitchen is where the light will go above the island. I have decided to not put up the wooden light fixture for now - it may get made at some point in the future but right now I like the openness of the rooms.

Windows and doors


Most of the windows and both of the doors have now been installed on the back of the house. The small window to the left/west of the kitchen doors and the window between the master bedroom and master bath still need to be installed. Makes a HUGE difference.

Wednesday, November 15, 2006

Update

Here is the latest information on the house renovation:

-The garage has a new roof. It will also be getting new siding, two new windows & a door in the front, and two new garage doors.

-The cabinet-maker measured for the kitchen cabinets on Monday. My sister-in-law wants to steal the cabinet/hutch he is making for the wall next to the basement door (she has started helping him keep his books & saw the rough sketch).

-As you can see in the photos posted below, the drywall is more-or-less completely installed now. The mudding and sanding will be done over the next few days.

-The gas company is supposed to hook up the gas tomorrow morning. The furnaces will be hooked up so the house can be heated.

-The “final” word from the City and MSD is that a storm water lateral has to be installed from the house to where the garage starts. While not optimal (i.e. not having to install one at all), it is better than having to have it installed to the alley which would involve chopping the garage floor up.

-The new side door has been installed. Sometime soon the front door will be removed for off-site renovation.

-Interior painting may start this weekend but probably will be done the first part of next week.

This leaves the following big items to be finished:
-floor renovation
-windows and new doors will be installed
-installation of light fixtures and outlets
-installation of the bathroom fixtures
-final wall painting
-installation of the “spindles” on the stairs (I still need to call about these)
-construction of the decks on the back
-and a whole lot more…

It is starting to look like a real house




Monday, November 13, 2006

The newest update...

I am sorry I have been tardy posting photos and providing updates. I just posted some photos of the dry wall that is up on the first floor – it is taking shape. This morning I met with the cabinet-maker to measure for the kitchen. I think that is all squared away. After that I talked with the contractor a bit (her crew was roofing the garage since the weather is nice).

The latest on the new lateral to the sewer is that the City is passing the buck to the Metropolitan Sewer District and the MSD is most likely going to make me install a lateral for storm water. Apparently MSD is planning ahead to some time in the future when it will be able to install new sewers and will have separate systems for sewage and storm water. While that probably won’t be until I am easily in my 50s since it will require the passage of a bond issue, I still will most likely have to do it.

It turns out that the electrician (who looks like Steve Buscemi, btw) has not gotten the inspector over to the house to approve the first floor yet so the dry wall that is up may have to partially come down for the inspection to take place. This does NOT make me happy.

I am also stressing on budget numbers this evening as I received the latest round of invoices. I am going to meet with the contractor before I approve any of them as I have questions and concerns. Especially since I am most likely going to have to have a damn second lateral installed…

Dry wall - first floor



Wednesday, November 08, 2006

More dry wall


These are more photos of the dry wall that is up on the second floor which was done Monday. Not much happened inside today. The electrical inspection for the first floor had to be done before the dry wall crew could start and I guess it did not get done early enough in the day.

The regular crew was working on the garage again today since the weather is so nice. I presume/hope that the drywall on the first floor will go up tomorrow. Hopefully...

Tuesday, November 07, 2006

Front of house




This isn't as dramatic as I would like it to be - I wish the new privacy fence was up and I had been able to get some landscaping put in - but there is a difference. True, it is mostly white paint but still...

Dry wall



The dry wall is going up. Quite rapidly actually. This is a photo of the front, west (left) bedroom. I thought I took more photos but actually did not. I was over there to point out some mistakes/issues that need to be corrected.

I was able to get the lights on the first floor wired the way I want them done (these were finished today before any dry wall goes up) but there are still issues on the second floor. I guess I will be going back to the house tomorrow morning to check on those. There was a part of me that wanted to take a hammer and knock holes in the dry wall where things were supposed to be. Probably would have helped my blood pressure...

Friday, November 03, 2006

Back of house 2



Back of house 1